Requirements for the construction of refuse transfer station
The location of the transfer station should meet the requirements of the overall urban planning and urban environmental sanitation industry planning. The location of the transfer station should be selected near the center of the service area or the place with the largest amount of garbage, and the transfer station should be located in a place with convenient transportation. In places with convenient railway and water transportation, when the transportation distance is relatively long, a railway and water transportation garbage transfer station should be set up.
The size of the transfer station shall be determined according to the amount of waste transfer.
The amount of waste transshipment shall be determined according to the actual data of the average daily output in the high-yield months of waste in the service area. When there is no actual data, it can be calculated as follows:
Q=δnq/1000
Where Q is the daily transshipment volume of the transshipment station (t/d);
n——the actual number of people in the service area;
q——The per capita daily output of garbage in the service area (kg/person·d), which is adopted according to the actual local data; when there is no local data, the per capita daily output of garbage can be 0.8-1.2 kg/person·d. In places with low gasification rate Take the high value, and take the low value where the gasification rate is high;
δ——The coefficient of variation of waste production. According to the actual local data, if there is no data, the delta value can be 1.3~1.5.